Boiler Install Photo Timeline at Packaging Manufacturer in Southern CA

Boiler Installation Packaging Company

RFMCO completes boiler removal and installation, including deaerator, at a consumer packaging company in Los Angeles

From engineering, rigging, startup and controls, RFMCO completed the job on schedule. Below is a photo timeline.

Boiler Removal & Installation Process

1. Sales & Engineering
   • Construct New Base Plate for Deaerator
2. Remove & Dispose Existing Boiler
3. Deliver, Rig & Install Boiler & Deaerator
4. Connect Wiring and Configure Controls
5. Test Boiler for Emissions Compliance
6. Provide Boiler Spare Parts

  1. Sales & Engineering: RFMCO Engineering Team determines the right boiler for the application and mapping out all of the details to fit in the existing footprint


  2. Remove & Dispose Existing Boiler: RFMCO removes all connections from existing boiler


  3. Deliver Boiler, Rigging & Installation: RFMCO rigs CB Boiler and installs into tight doorway


  4. Connect Wiring and Configure Controls: RFMCO Boiler Technician uses safety harness to finish all boiler controls and connections


  5. Test Boiler for Emissions Compliance: Cleaver-Brooks boiler passes emissions, paperwork provided for state of California, RFMCO provides best maintenance plan options